This study examined the doctrine of time of the essence and how the UK courts interpret it in the sphere of building contracts. In a wide sample of cases heard before the UK courts, this study looked at the literal and legal meanings of time of the essence, especially when the phrase was incorporated into contracts, and when a party can utilize it if their counterpart fails to honor their contractual obligations. Time of the essence is a doctrine with a long and interesting history. Yet, the doctrine either tends to be briefly covered in leading authorities on construction law or gets diluted alongside the doctrines of repudiation and time at large, ultimately muffling the doctrine without any apposite explanation of its full effect in a construction law context. The background of this study rests on the need to enunciate the doctrine and expound on the viewpoints of UK legal practitioners regarding time as not being of the essence in building contracts. In practice, time tends to be essential only for particular contractual provisions, not the entire contract. Therefore, the aim of this study was to solely focus on the doctrine of time of the essence in building contracts, explaining the meaning of the doctrine, why it has a limited scope under building contracts, discerning situations in which its unwarranted stipulation under a building contract can lead to inadvertent outcomes, and showing why UK courts render time as not being of the essence when posed with the question of whether time is (or is not) of the essence in building contracts. The study methodology entailed electronically accessing the LexisNexis legal database to take out a chronological sample of cases heard before the UK courts that covered the doctrine of time of the essence in the context of building contracts. Because of a lack of journal articles focusing on this topic, the study also reviewed the leading legal authorities on construction and contract law. The study demonstrated that time is generally not of the essence in building contracts. In theory, time may be rendered as being of the essence in any contract in which it is expressly stipulated under the contract, implied, or when a notice is served rendering it as such. Yet, in the context of building contracts, the nature in which these conditions must be satisfied and the practical dynamic of building arrangements as a whole are very peculiar, making it highly unlikely for a court to find time to be of the essence.

Item Type: Article
Uncontrolled Keywords: time of the essence,building contracts,delay,international construction law,safety, risk, reliability and quality,engineering (miscellaneous),law,building and construction,civil and structural engineering ,/dk/atira/pure/subjectarea/asjc/2200/2213
Faculty \ School: Faculty of Social Sciences > School of Law
Related URLs:
Depositing User: LivePure Connector
Date Deposited: 20 Feb 2023 16:30
Last Modified: 09 Mar 2024 09:31
URI: https://ueaeprints.uea.ac.uk/id/eprint/91216
DOI: 10.1061/JLADAH.LADR-949

Downloads

Downloads per month over past year

Actions (login required)

View Item View Item