A role for the public in the long-term management of English coastal flood risk?

Van Der Plank, Sien, Brown, Sally, Nicholls, Robert J. ORCID: https://orcid.org/0000-0002-9715-1109 and Tompkins, Emma (2019) A role for the public in the long-term management of English coastal flood risk? In: Australasian Coasts and Ports 2019 Conference, 2019-09-10 - 2019-09-13.

Full text not available from this repository. (Request a copy)

Abstract

The widely accepted flood risk management (FRM) doctrine acknowledges that measures such as control, accommodation and adaptation should constitute part of flood preparedness. We do not know the process and extent to which FRM through insurance, planning and engineering collectively manages coastal flood risk at a sub-national level in England. Therefore, this paper analyses the challenges to integrating these policy approaches to coastal FRM locally in England. Interviews in two regions with key stakeholders (n = 45) covered the costs, timing, power, responsibility, acceptability, equity, and effectiveness of FRM. Results from a thematic analysis of responses indicate challenges around the local integration of coastal FRM are long-term management and public participation. Respondents across insurance, engineering and planning suggested that England's national and local policies for coastal areas lack a long-term, shared, achievable and resourced vision. Funding policies prioritise individual soft and hard engineering schemes, making it difficult to obtain long-term government funding for managing the choice to accept or retreat from coastal flood risk. Stakeholders suggested the “public” should be more aware and involved in coastal FRM, but in both case study areas there were limited examples of ongoing long-term strategies to engage the public. The results suggest an absence of a holistic, adaptable, future vision for England's coasts where planning and other FRM approaches are combined, and a continued absence of the public in the decision-making process. Without support to actualise long-term adaptation plans and engage the public in that process, it is likely that non-defence coastal FRM options may continue to struggle to be realised.

Item Type: Conference or Workshop Item (Paper)
Additional Information: Funding Information: The authors thank all interviewees who generously gave their time to participate in this study. They also thank the input of Prof James Davey in the development of the research. This research is funded by the Engineering and Physical Sciences Research Council and the Leverhulme Trust. Publisher Copyright: © Australasian Coasts and Ports 2019 Conference. All rights reserved.
Uncontrolled Keywords: adaptation,awareness,coastal flood risk management,responsibility,stakeholder engagement,ocean engineering ,/dk/atira/pure/subjectarea/asjc/2200/2212
UEA Research Groups: University of East Anglia Schools > Faculty of Science > Tyndall Centre for Climate Change Research
Faculty of Science > Research Centres > Tyndall Centre for Climate Change Research
Related URLs:
Depositing User: LivePure Connector
Date Deposited: 03 Nov 2022 11:31
Last Modified: 03 Nov 2022 11:31
URI: https://ueaeprints.uea.ac.uk/id/eprint/89553
DOI:

Actions (login required)

View Item View Item