Lockwood, Paul, Burton, Christopher, Shaw, Theresa, Woznitza, Nicholas, Compton, Emma, Groombridge, Heather, Hayes, Natasha, Mane, Uday, O’Brien, Anna and Patterson, Stephanie (2025) An implementation facilitation intervention to improve the musculoskeletal X-ray reporting by radiographers across London. BMC Health Services Research, 25. ISSN 1472-6963
Preview |
PDF (Lockwood_etal_2025_BMCHealthServicesResearch)
- Published Version
Available under License Creative Commons Attribution. Download (8MB) | Preview |
Abstract
Background: The National Healthcare Service (NHS) radiology service delivery in London is representative of the current pressures and challenges faced in England of Musculoskeletal (MSK) X-ray reporting workforce shortages, and national turnaround time (TATs) targets. The implementation project evaluated facilitation as a strategy to achieve the NHS England 50% target for all MSK X-rays to be reported by radiographers. Methods: The project was an eight-month multi-centre (n = 5 London NHS Trusts) study applying the Promoting Action on Research Implementation in Health Services (PARIHS) framework with embedded mixed-methods evaluation. Initial observational data using the Context Assessment Index (CAI) tool and the Workplace Culture Critical Analysis Tool (WCCAT) set the implementation interventions which comprised external facilitation, to support internal facilitators action learning activities. Evaluation data comprised monthly reporting performance, systems mapping, interviews. Results: System mapping allowed a perspective beyond the characteristics of the NHS Trusts involved (small single site hospitals to large multi-sites hospitals) of mixed clinical duties, scope of practice, reporting session allocation, and equipment used. CAI scores for workplace culture demonstrated x¯ = 73.7% (SD 6.8; 95%CI 8.49), leadership scored x¯ = 69.3% (SD 7.3; 95% CI 9.17), and evaluation scored x¯ = 75.5% (SD 6.9; 95% CI 98.63). WCCAT observations provided themes for facilitation focusing on remote reporting, insourcing backlogs, prioritising worklists to reduce breaching TATs, reporting metrics, and reducing auto reporting. The combined reporting of MSK X-rays by London radiographers during this study achieved x¯ = 53.7%. Conclusion: This study had an innovative approach using an implementation facilitation framework to improve service delivery. The clinical workplace context in which MSK X-ray reporting by radiographers occurs was key to implementing change. The complexities of sustaining and upscaling MSK X-ray reporting by radiographers to meet the NHS England target of 50% are varied and require local champions to facilitate and drive change at organisational levels. It is recommended that there are dedicated ‘resources’ to sustain implementations with a community of practice for support. Workplace leadership and stakeholder networks are needed to sustain improved working practices and embrace regular evaluation and monitoring of service delivery performance.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | implementation facilitation,reporting radiographers; musculoskeletal; x-rays,health policy,sdg 3 - good health and well-being ,/dk/atira/pure/subjectarea/asjc/2700/2719 |
Faculty \ School: | Faculty of Medicine and Health Sciences > School of Health Sciences |
Related URLs: | |
Depositing User: | LivePure Connector |
Date Deposited: | 04 Apr 2025 12:30 |
Last Modified: | 07 Apr 2025 00:19 |
URI: | https://ueaeprints.uea.ac.uk/id/eprint/98938 |
DOI: | 10.1186/s12913-025-12356-x |
Downloads
Downloads per month over past year
Actions (login required)
![]() |
View Item |